Solis Arx Progress Park Data Center Campus
Solis Arx has proposed a data center in Wythe County, Virginia (proposed). One source reports this facility in the Kapwork Grow tracker.
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Solis Arx
Utility
Appalachian Power
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 9 mo ago
Announced
- 9 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Solis Arx
- Stage
- Proposed
- Facility type
- AI data center
Reported dates
- Announced
- 2025-12-05Reported date — see the source for the event evidenced.
Site
- City
- Max Meadows
- County
- Wythe
- State
- Virginia
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Utility
- Appalachian Power
- Power source
- Grid power
- AI workload
- Confirmed AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Solis Arx Progress Park Data Center Campus | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 26, 2026 · Record: solis-arx-progress-park-wythe-va
- CACardinal News (cited by Compute Atlas)As of: Jul 26, 2026
- CAWythe County, VA (government) (cited by Compute Atlas)As of: Jul 26, 2026
- CAWythe County, VA (government) (cited by Compute Atlas)As of: Jul 26, 2026
- CAWSLS 10 (cited by Compute Atlas)As of: Jul 26, 2026
- CASouthwest Virginia Sun (cited by Compute Atlas)As of: Jul 26, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 218214103187281
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Solis Arx Progress Park Data Center Campus”, https://kapwork.com/grow/directory/datacenters/solis-arx-progress-park-data-center-campus-va-dc_c676ee1aff51, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.