OpenAI is building a 1400 MW data center in Washtenaw County, Michigan (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 1400 MW
- Investment
- $16B
- Site
- 250 acres
- Reported jobs
- 450
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other OpenAI builds
Operator
OpenAI
Utility
DTE Energy
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 3 mo ago
Construction start
- 3 mo ago
Event date: · First observed: Not reported
- 11 mo ago
Announced
Reported updates without an event date
Reported for 2025-10.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- OpenAI
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 1400 MW
- Reported investment
- $16B
- Site area
- 250 acres
- Reported jobs
- 450
Reported dates
- Announced
- 2025-10
- Construction start reported
- 2026-06-01Reported date — see the source for the event evidenced.
Site
- City
- Saline Township
- County
- Washtenaw
- State
- Michigan
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- DTE Energy
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- Confirmed AI or machine-learning workload
Sources, method and limits
Show 9 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Stargate The Barn Campus | Under construction | 1400 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: stargate-saline-township-mi
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 5, 2026
- CACNBC (cited by Compute Atlas)As of: Jul 5, 2026
- CARelated Digital (cited by Compute Atlas)As of: Jul 6, 2026
- CAPR Newswire (cited by Compute Atlas)As of: Jul 6, 2026
- CAFortune (cited by Compute Atlas)As of: Jul 6, 2026
- CARelated Companies (cited by Compute Atlas)As of: Sep 9, 2026
- CACitizens Utility Board of Michigan (cited by Compute Atlas)As of: Sep 9, 2026
- CAMichigan Public Service Commission (LARA e-docket) (cited by Compute Atlas)As of: Sep 14, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 73582215826046
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Stargate The Barn Campus”, https://kapwork.com/grow/directory/datacenters/stargate-the-barn-campus-mi-dc_42ec31d60a7e, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.