Summit Ridge Data Center
Data Center Power Company is building a 100 MW data center in Utah County, Utah (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 100 MW
- Building area
- 228,509 sq ft
- Expected completion
- 2027
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Data Center Power Company
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- next year
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 8 mo ago
Announced
- 8 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2027.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Data Center Power Company
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 100 MW
- Reported building area
- 228,509 sq ft
Reported dates
- Announced
- 2026-01-30Reported date — see the source for the event evidenced.
- Expected completion
- 2027
Site
- City
- Santaquin
- County
- Utah
- State
- Utah
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Summit Ridge Data Center | Under construction | Not reported |
| Server Country | Data Center Power Company - Summit Ridge Data Center | Proposed | 100 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 5, 2026 · Record: summit-ridge-santaquin-ut
- CAKSL.com (cited by Compute Atlas)As of: Aug 14, 2026
- CAKem C. Gardner Policy Institute, University of Utah (cited by Compute Atlas)As of: Aug 14, 2026
- CA
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0850
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 167927310703998
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Summit Ridge Data Center”, https://kapwork.com/grow/directory/datacenters/summit-ridge-data-center-ut-dc_98ba9fb3dd7e, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.