Skip to content
Data center buildUnder construction

T5 Chicago IV (CHI IV)

T5Grayslake, Lake County, ILUpdated

T5 is building a 1200 MW data center in Lake County, Illinois (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
1200 MW
Site
400 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. this year

    Announced

  2. Today

    Under construction

    Last material change Sep 24, 2026.

  3. 3 mo ago

    Construction start

  4. 3 mo ago

    Construction start reported

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
T5Operator · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655

Scale

Reported capacity
1200 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il
Site area
400 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655

Reported dates

Announced
2026Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il
Construction start reported
2026-06-08Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-ilReported date — see the source for the event evidenced.

Site

City
GrayslakeCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il
County
LakeCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il
State
IllinoisState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655

Power and cooling

Utility
ComEdUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655
Cooling
Closed loopCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il

Permits and public records

Incentives reported
Illinois Data Center Investment Program (Illinois) $15,625,000Incentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 10855114423655

Sources, method and limits

Show 8 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasT5 Chicago IV (CHI IV)Under construction1200 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 12, 2026 · Record: t5-chicago-iv-grayslake-il
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. CA
  9. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “T5 Chicago IV (CHI IV)”, https://kapwork.com/grow/directory/datacenters/t5-chicago-iv-chi-iv-il-dc_09df673d3d67, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds