Texas Critical Data Centers (TCDC)
Sharon AI + New Era Energy & Digital (joint venture) has proposed a 250 MW data center in Ector County, Texas (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 250 MW
- Site
- 438 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Sharon AI + New Era Energy & Digital (joint venture)
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Sharon AI + New Era Energy & Digital (joint venture)
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 250 MW
- Site area
- 438 acres
Site
- County
- Ector
- State
- Texas
- Location precision
- Site footprint confirmed
Power and cooling
- Power source
- Mixed sources
- AI workload
- Confirmed AI or machine-learning workload
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Texas Critical Data Centers (TCDC) | Proposed | 250 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 24, 2026 · Record: tcdc-ector-county-tx
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 9, 2026
- CAReport cited by Compute AtlasAs of: Jul 24, 2026
- CAReport cited by Compute AtlasAs of: Jul 24, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 276749336615298
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Texas Critical Data Centers (TCDC)”, https://kapwork.com/grow/directory/datacenters/texas-critical-data-centers-tcdc-tx-dc_fbb3b9e69982, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.