HarvestBeam Inc. · Fiber · North Carolina
Official project code: CM61-BEAD-NC-1000026517-1
HarvestBeam Moore County Expansion (CM61-BEAD-NC-1000026517-1) is a broadband project record in North Carolina. Recorded technology: Fiber. Reported award: not reported. Linked award holder: HarvestBeam Inc..
- Technology
- Fiber
Who's on this project
The award holder decides its own bids and subcontracts.
- Company profile
Award holder
HarvestBeam Inc.
- State record
State program
North Carolina BEAD market
Record quality
- Sources cited
- 1
- Summary
- From published records
- Source as of
- Last material change
Record details
NTIA NTIA federal reporting
- Official project code
- CM61-BEAD-NC-1000026517-1
- Project state or territory
- North Carolina
- Reported award
- Not reportedReporting period: 2026-04-13
- Planned service locations
- Not reportedReporting period: 2026-04-13
- Recorded deployment technologies
- Fiber
- Project award status
- Provisional
- Planned start
- Not reportedPlanned date — not evidence that work occurred.
- Planned completion
- Not reportedPlanned date — not evidence that work occurred.
Description supplied by the source
HarvestBeam proposes to connect over 509 BEAD eligible residential units throughout Moore County with 40 MHz of Priority Access Licensed spectrum (PAL’s) in the CBRS band as well as 40Mhz of Generally Available Access (GAA) spectrum and 80 MHz of unlicensed spectrum in the 6 GHz band to deliver up to 641 Mbps downlink and 143 Mbps uplink with a typical roundtrip latency of 10 Milliseconds. The project utilizes two towers: one owed by Riverstreet networks and one owned by American Tower Corporation (ATC) to deploy Tarana G1 wireless Base Nodes and Residential Nodes in the 3.5Ghz (CBRS) and 6 GHz bands. HarvestBeam will also utilize both licensed 11 GHz microwave backhaul and fiber backhaul to transport traffic to and from the DIA located at a central office owned by Riverstreet Networks, at 254 2nd St Ellerbe NC.
Sources, method and limits
Show 1 sourceHide
Sources and evidence
- NTIANTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:NC:CM61-BEAD-NC-1000026517-1
Limitations and interpretation
- An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
- Historical record: this entity is absent from the selected source snapshot. Check the dated source for current status.
Cite or correct this record
Kapwork Grow, “HarvestBeam Inc. · Fiber · North Carolina”, https://kapwork.com/grow/directory/bead/projects/harvestbeam-moore-county-expansion-pr_355f85c3bcdc843e7f02, materially updated Sep 17, 2026.
Report an error in this record and we will check it against the cited sources.
An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
Related records
Kapwork Grow
Every BEAD award in the directory, in one place.
Search by trade, company or place.