Skip to content
BEAD projectProvisional

Valliant Telephone Company, Inc. · Fiber · Oklahoma

Official project code: CM61-BEAD-OK-127-2300

Valliant Telephone Company, Inc.OklahomaUpdated

Valliant Telephone Company - Garvin Project (CM61-BEAD-OK-127-2300) is a broadband project record in Oklahoma. Recorded technology: Fiber. Reported award: not reported. Linked award holder: Valliant Telephone Company, Inc..

Technology
Fiber
Planned completion
Sep 30, 2027 (2027-09-30)

Who's on this project

The award holder decides its own bids and subcontracts.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in 12 mo

    Planned completionPlanned

  2. Today

    Provisional

    Last material change Sep 17, 2026.

  3. 5 mo ago

    Planned startPlanned

Record quality

Sources cited
1
Summary
From published records
Source as of
Last material change

Record details

NTIA NTIA federal reporting

Official project code
CM61-BEAD-OK-127-2300Official project code · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300
Project state or territory
OklahomaProject state or territory · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300
Reported award
Not reportedReported award · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300Reporting period: 2026-04-13
Planned service locations
Not reportedPlanned service locations · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300Reporting period: 2026-04-13
Recorded deployment technologies
FiberRecorded deployment technologies · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300
Project award status
ProvisionalProject award status · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300
Planned start
2026-04-01Planned start · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300Planned date — not evidence that work occurred.
Planned completion
2027-09-30Planned completion · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300Planned date — not evidence that work occurred.

Description supplied by the source

This project is to deploy fiber-to-the-premises (FTTP) broadband infrastructure to address a well-documented and persistent lack of reliable, high-speed internet access in the project area. This is a necessary investment in closing the digital divide that has left many households and businesses without access to an adequate minimum level of service, as defined by the BEAD program. These areas were selected for their project due to their proximity to the applicant's existing FTTP network. Combined with the company's deep roots in the areas, this will enable a rapid and seamless buildout with quick, trusted, and reliable uptake by subscribers.\\n\\nThe need for this project arises from the absence of existing broadband infrastructure capable of delivering reliable, scalable, and affordable service. Residents in the proposed service area face significant barriers to full participation in education, remote work, telehealth, and digital commerce. Without intervention, these communities will continue to fall further behind in key indicators of economic and social well-being.\\n\\nDeploying fiber is the most cost-effective and future-proof solution to meet this need. While other technologies such as satellite and fixed wireless may provide temporary or limited relief, they typically fall short in meeting speed, latency, capacity, and reliability standards over the long term. Fiber infrastructure, by contrast, offers unparalleled scalability and durability, supporting symmetrical multi-gigabit speeds and adapting seamlessly to future technological demands.\\n\\nThis project was evaluated against alternative solutions, and fiber emerged as the most sustainable and cost-efficient option when considering lifecycle costs, performance, and ability to meet minimum service thresholds. The investment aligns with BEAD’s emphasis on targeting unserved and underserved areas with a durable solution that ensures digital equity and economic opportunity for all, as well as with the applicant's long-term goals of building out future-proofed FTTH infrastructure for the local community that they are deeply embedded in, having served McCurtain and Choctaw counties for over 60 years.\\n\\nIn summary, this project is a critical, targeted response to an identified broadband service gap and represents the most effective use of public funds to deliver long-lasting infrastructure that meets current and future connectivity needs, empowering a local ISP with “boots on the ground” to better serve their local community.

Description supplied by the source · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300

Sources, method and limits

Show 1 sourceHide

Sources and evidence

  1. NTIA
    NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-127-2300

Limitations and interpretation

  • An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
  • Historical record: this entity is absent from the selected source snapshot. Check the dated source for current status.

Cite or correct this record

Kapwork Grow, “Valliant Telephone Company, Inc. · Fiber · Oklahoma”, https://kapwork.com/grow/directory/bead/projects/valliant-telephone-company-garvin-project-pr_dfe786cf4281a820a89c, materially updated Sep 17, 2026.

Report an error in this record and we will check it against the cited sources.

An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.