Skip to content
Data center buildProposed

Amazon Data Services Creekside Campus

Amazon Web ServicesCedar Creek area, Bastrop County, TXUpdated

Amazon Web Services has proposed a data center in Bastrop County, Texas (proposed). One source reports this facility in the Kapwork Grow tracker.

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 4 mo ago

    Announced

  3. 4 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
1
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
Amazon Web ServicesOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0845
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0845
Facility type
HyperscaleFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 153466137746598

Reported dates

Announced
2026-05-08Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0845Reported date — see the source for the event evidenced.

Site

City
Cedar Creek areaCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0845
County
Bastrop CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0845
State
TexasState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0845

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryAmazon Data Services Creekside CampusProposedNot reported

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0845
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Amazon Data Services Creekside Campus”, https://kapwork.com/grow/directory/datacenters/amazon-data-services-creekside-campus-tx-dc_8b939ea01ca6, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds