Skip to content
Data center buildProposed2 datasets report

DC BLOX Montgomery Data Center

DC BLOXMontgomery, Montgomery County, ALUpdated

DC BLOX has proposed a 40 MW data center in Montgomery County, Alabama (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
40 MW
Investment
$30M

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 15 mo ago

    Construction start

  3. ~2 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
2, figures differ
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
DC BLOXOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-alOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0004
Tenants
Unnamed hyperscale anchor tenant, single unnamed hyperscale clientTenants · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 99381200404069
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-al
Facility type
ColocationFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 99381200404069

Scale

Reported capacity
40 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-alReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0004
Reported investment
$30MReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 99381200404069

Reported dates

Announced
2024-11Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-al
Construction start reported
2025-06Construction start reported · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0004

Site

City
MontgomeryCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-alCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0004
County
MontgomeryCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-alCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0004
State
AlabamaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-alState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0004
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 99381200404069

Power and cooling

AI workload
Mixed use, AI among other workloadsAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 15, 2026 · Record: dc-blox-montgomery-al

Sources, method and limits

Show 6 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasDC BLOX Montgomery Data CenterProposed40 MW
Server CountryDC BLOX Montgomery Data CenterUnder construction40 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 15, 2026 · Record: dc-blox-montgomery-al
  2. CA
  3. CA
  4. CA
  5. CA
  6. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0004
  7. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “DC BLOX Montgomery Data Center”, https://kapwork.com/grow/directory/datacenters/dc-blox-montgomery-data-center-al-dc_5a62fd25be65, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds