Google Botetourt Center at Greenfield Data Center Campus
Google has approval for a data center in Botetourt County, Virginia (approved). 2 sources report this facility in the Kapwork Grow tracker.
- Investment
- $3B
- Building area
- 928,000 sq ft
- Site
- 312 acres
- Expected completion
- 2028
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Google builds
Operator
Google
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 2 yr
Expected completionPlanned
- Today
Approved
Last material change Sep 24, 2026.
- 15 mo ago
Announced
- 15 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2028.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Stage
- Approved
- Facility type
- Hyperscale
Scale
- Reported investment
- $3B
- Reported building area
- 928,000 sq ft
- Site area
- 312 acres
Reported dates
- Announced
- 2025-06-24Reported date — see the source for the event evidenced.
- Expected completion
- 2028
Site
- City
- Daleville
- County
- Botetourt
- State
- Virginia
- Location precision
- Street address reported
Power and cooling
- Cooling
- Air cooled
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Google Botetourt Center at Greenfield Data Center Campus | Approved | Not reported |
| Server Country | Google Botetourt County Data Center Campus | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 27, 2026 · Record: google-botetourt-greenfield-va
- CABotetourt County, Virginia (cited by Compute Atlas)As of: Aug 27, 2026
- CAWSLS 10 (cited by Compute Atlas)As of: Aug 27, 2026
- CAWSET (cited by Compute Atlas)As of: Aug 27, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0856
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 4981829807520
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Google Botetourt Center at Greenfield Data Center Campus”, https://kapwork.com/grow/directory/datacenters/google-botetourt-center-at-greenfield-data-center-campus-va-dc_0487ec322da0, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.