Google Haskell County Data Center Campus
Google is building a data center in Haskell County, Texas (under construction). One source reports this facility in the Kapwork Grow tracker.
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Google builds
Operator
Google
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 10 mo ago
Announced
- 10 mo ago
Event date: · First observed: Not reported
- 10 mo ago
Construction start
Reported updates without an event date
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Stage
- Under construction
- Facility type
- AI data center
Reported dates
- Announced
- 2025-11-14Reported date — see the source for the event evidenced.
- Construction start reported
- 2025-11
Site
- City
- Haskell
- County
- Haskell
- State
- Texas
- Location precision
- Site footprint confirmed
Power and cooling
- Power source
- Solar
- AI workload
- Confirmed AI or machine-learning workload
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Google Haskell County Data Center Campus | Under construction | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 7, 2026 · Record: google-haskell-county-tx
- CATexas Tribune (cited by Compute Atlas)As of: Jul 7, 2026
- CAOffice of the Texas Governor (cited by Compute Atlas)As of: Jul 7, 2026
- CAGoogle (cited by Compute Atlas)As of: Jul 7, 2026
- CAIntersect Power (cited by Compute Atlas)As of: Jul 7, 2026
- CAKTXS ABC Abilene (cited by Compute Atlas)As of: Jul 7, 2026
- CAKAUZ News Channel 6 (cited by Compute Atlas)As of: Jul 7, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 56361421294384
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Google Haskell County Data Center Campus”, https://kapwork.com/grow/directory/datacenters/google-haskell-county-data-center-campus-tx-dc_3342aa7ecb30, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.