Skip to content
Data center buildUnder construction

Google Meitner Energy Center

GooglePampa, Gray County, TXUpdated

Google is building a data center in Gray County, Texas (under construction). One source reports this facility in the Kapwork Grow tracker.

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. this year

    Announced

  2. this year

    Construction start

  3. Today

    Under construction

    Last material change Sep 24, 2026.

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
GoogleOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 226996211186864

Reported dates

Announced
2026Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx
Construction start reported
2026Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx

Site

City
PampaCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx
County
GrayCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 226996211186864

Power and cooling

Power source
Mixed sourcesPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 226996211186864
Cooling
Air cooledCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 226996211186864
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: google-meitner-pampa-tx

Permits and public records

Incentives reported
Gray County Chapter 312 property-tax abatement - air-cooling (no water) required as a condition; reported ~100% relief for 10 years per phase across up to 3 phases (per New Project Media / local reporting) (Gray County, TX)Incentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 226996211186864

Sources, method and limits

Show 5 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasGoogle Meitner Energy CenterUnder constructionNot reported

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 8, 2026 · Record: google-meitner-pampa-tx
  2. CA
  3. CA
  4. CA
  5. CA
  6. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Google Meitner Energy Center”, https://kapwork.com/grow/directory/datacenters/google-meitner-energy-center-tx-dc_ce73ac887cb0, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds