HashWorks Powered Land — Waterford Site
HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56) has proposed a 200 MW data center in Washington County, Ohio (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 200 MW
- Site
- 500 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 200 MW
- Site area
- 500 acres
Site
- County
- Washington
- State
- Ohio
- Location precision
- Street address reported
Power and cooling
- AI workload
- Mixed use, AI among other workloads
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | HashWorks Powered Land — Waterford Site | Proposed | 200 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 9, 2026 · Record: cipher-digital-hashworks-waterford-washington-oh
- CAWOUB Public Media (cited by Compute Atlas)As of: Aug 26, 2026
- CANews and Sentinel (cited by Compute Atlas)As of: Aug 26, 2026
- CAAthens County Independent (cited by Compute Atlas)As of: Sep 9, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 276051908182908
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “HashWorks Powered Land — Waterford Site”, https://kapwork.com/grow/directory/datacenters/hashworks-powered-land-waterford-site-oh-dc_fb1157ed437c, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.