Meta Los Lunas AI Expansion
Meta is building a data center in Valencia County, New Mexico (under construction). One source reports this facility in the Kapwork Grow tracker.
- Investment
- $800M
- Site
- 750 acres
- Reported jobs
- 30
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Meta builds
Operator
Meta
Utility
Public Service Company of New Mexico (PNM)
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 17 mo ago
Construction start
- ~2 yr ago
Announced
Reported updates without an event date
Reported for 2025-04.
Event date: Not reported · First observed: Not reported
Reported for 2024-12.
Event date: Not reported · First observed: Not reported
Reported for 2016-01.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Meta
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported investment
- $800M
- Site area
- 750 acres
- Reported jobs
- 30
Reported dates
- Announced
- 2024-12
- Construction start reported
- 2025-04
Site
- City
- Los Lunas
- County
- Valencia
- State
- New Mexico
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Public Service Company of New Mexico (PNM)
- Power source
- Solar
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Industrial Revenue Bonds (IRBs) — third series (Village of Los Lunas, NM)
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Meta Los Lunas AI Expansion | Under construction | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 15, 2026 · Record: meta-los-lunas-ai-nm
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- CANews-Bulletin (Valencia County) (cited by Compute Atlas)As of: Aug 20, 2026
- CAEnergy-Storage.news (cited by Compute Atlas)As of: Sep 15, 2026
- CAThe Santa Fe New Mexican (cited by Compute Atlas)As of: Aug 8, 2026
- CA
- CAPR Newswire / DESRI (cited by Compute Atlas)As of: Sep 15, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 96129688560473
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Meta Los Lunas AI Expansion”, https://kapwork.com/grow/directory/datacenters/meta-los-lunas-ai-expansion-nm-dc_576deff06359, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.