Meta Bowling Green (Project Accordion)
Meta is building a 350 MW data center in Wood County, Ohio (under construction). 3 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 350 MW
- Investment
- $800M
- Building area
- 715,000 sq ft
- Site
- 280 acres
- Expected completion
- 2027
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Meta builds
Operator
Meta
Utility
Toledo Edison
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- next year
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 17 mo ago
Construction start
- ~2 yr ago
Announced
Reported updates without an event date
Reported for 2027.
Event date: Not reported · First observed: Not reported
Reported for 2025-04.
Event date: Not reported · First observed: Not reported
Reported for 2025-04.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Meta
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 350 MW
- Reported investment
- $800M
- Reported building area
- 715,000 sq ft
- Site area
- 280 acres
- Reported jobs
- 100
Reported dates
- Announced
- 2025-01-08Reported date — see the source for the event evidenced.
- Construction start reported
- 2025-04
- Expected completion
- 2027
Site
- City
- Bowling Green
- County
- Wood
- State
- Ohio
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Toledo Edison
- Power source
- Mixed sources
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Government records on file
- 1
- Incentives reported
- Community Reinvestment Area 75% property tax abatement (Wood County, OH)
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Meta Bowling Green (Project Accordion) | Under construction | Not reported |
| Server Country | Meta Bowling Green Data Center | Under construction | 350 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 6, 2026 · Record: meta-middleton-township-oh
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- CAMeta Data Centers (cited by Compute Atlas)As of: Jul 6, 2026
- CAConstruction Owners Association of America (cited by Compute Atlas)As of: Jul 6, 2026
- CAOhio Power Siting Board (cited by Compute Atlas)As of: Jul 6, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0986
- PEPublic Evidence Project: Permit from Ohio Power Siting BoardAs of: Aug 6, 2026 · Record: source-meta-middleton-township-oh
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 126913430062865
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Meta Bowling Green (Project Accordion)”, https://kapwork.com/grow/directory/datacenters/meta-bowling-green-project-accordion-oh-dc_736d55ea8711, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.