Meta El Paso AI Data Center Campus
Meta is building a 1000 MW data center in El Paso County, Texas (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1000 MW
- Investment
- $10B
- Building area
- 4 sq ft
- Site
- 1,000 acres
- Expected completion
- Feb 28, 2029 (2029-02-28)
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Meta builds
Operator
Meta
Utility
El Paso Electric
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in ~2 yr
Expected completionPlanned
- in ~2 yr
Event date: · First observed: Not reported
- Today
Under construction
Last material change Sep 24, 2026.
- 6 mo ago
Announced
- 6 mo ago
Event date: · First observed: Not reported
- 10 mo ago
Construction start
- 10 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Meta
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 1000 MW
- Reported investment
- $10B
- Reported building area
- 4 sq ft
- Site area
- 1,000 acres
- Reported jobs
- 300
Reported dates
- Announced
- 2026-03-26Reported date — see the source for the event evidenced.
- Construction start reported
- 2025-11-01Reported date — see the source for the event evidenced.
- Expected completion
- 2029-02-28Planned date — not evidence that work occurred.
Site
- City
- El Paso
- County
- El Paso
- State
- Texas
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- El Paso Electric
- Power source
- Mixed sources
- Cooling
- Closed loop
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Property Tax Abatement; Grant; Infrastructure Support; Other; $550,000,000
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Meta El Paso AI Data Center Campus | Under construction | 1000 MW |
| Server Country | Meta El Paso Data Center | Under construction | 1000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 8, 2026 · Record: meta-el-paso-tx
- CAMeta (cited by Compute Atlas)As of: Jul 6, 2026
- CACNBC (cited by Compute Atlas)As of: Jul 6, 2026
- CATexas Tribune (cited by Compute Atlas)As of: Jul 6, 2026
- CAMeta Data Centers (cited by Compute Atlas)As of: Sep 8, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0621
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 140318127707103
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Meta El Paso AI Data Center Campus”, https://kapwork.com/grow/directory/datacenters/meta-el-paso-ai-data-center-campus-tx-dc_7f9e5c2853df, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.