Meta Beaver Dam Data Center Campus
Meta is building a 220 MW data center in Dodge County, Wisconsin (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 220 MW
- Investment
- $1B
- Building area
- 700,000 sq ft
- Expected completion
- 2027
- Reported jobs
- 100
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Meta builds
Operator
Meta
Utility
Alliant Energy
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- next year
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 6 mo ago
Construction start
- 10 mo ago
Announced
Reported updates without an event date
Reported for 2027.
Event date: Not reported · First observed: Not reported
Reported for 2026-03.
Event date: Not reported · First observed: Not reported
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Meta
- Tenants
- Meta Platforms
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 220 MW
- Reported investment
- $1B
- Reported building area
- 700,000 sq ft
- Reported jobs
- 100
Reported dates
- Announced
- 2025-11
- Construction start reported
- 2026-03
- Expected completion
- 2027
Site
- City
- Beaver Dam
- County
- Dodge
- State
- Wisconsin
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Alliant Energy
- Power source
- Grid power
- Cooling
- Air cooled
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Wisconsin sales and use tax exemption for a qualified data center (WEDC certification of Degas LLC, Beaver Dam — County Road A; certified 2/18/2025) (Wisconsin)
Sources, method and limits
Show 12 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Meta Beaver Dam Data Center Campus | Under construction | 220 MW |
| Server Country | Meta Platforms Data Center - Beaver Dam | Under construction | 220 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 13, 2026 · Record: meta-beaver-dam-wi
- CAMeta (cited by Compute Atlas)As of: Jul 6, 2026
- CAConstruction Dive (cited by Compute Atlas)As of: Jul 6, 2026
- CAWEDC (cited by Compute Atlas)As of: Jul 6, 2026
- CAWisconsin Public Radio (WPR) (cited by Compute Atlas)As of: Jul 17, 2026
- CAWisconsin Public Radio (cited by Compute Atlas)As of: Sep 10, 2026
- CAThe Daily Reporter (cited by Compute Atlas)As of: Sep 10, 2026
- CAWisBusiness (cited by Compute Atlas)As of: Sep 13, 2026
- CAAlliant Energy (cited by Compute Atlas)As of: Sep 13, 2026
- CAWisconsin Department of Revenue (cited by Compute Atlas)As of: Sep 13, 2026
- CAWisconsin Public Radio (cited by Compute Atlas)As of: Sep 13, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0580
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 114250083828369
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Meta Beaver Dam Data Center Campus”, https://kapwork.com/grow/directory/datacenters/meta-beaver-dam-data-center-campus-wi-dc_67e8eba98291, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.