Meta Project Anthem — Tulsa
Meta is building a 114 MW data center in Tulsa County, Oklahoma (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 114 MW
- Investment
- $1B
- Building area
- 2M sq ft (2,000,000 sq ft)
- Site
- 340 acres
- Expected completion
- 2030
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Meta builds
Operator
Meta
Utility
Public Service Company of Oklahoma (PSO)
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 4 yr
Expected completionPlanned
- this year
Construction start
- Today
Under construction
Last material change Sep 24, 2026.
- ~3 yr ago
Announced
Reported updates without an event date
Reported for 2030.
Event date: Not reported · First observed: Not reported
Reported for 2026.
Event date: Not reported · First observed: Not reported
Reported for 2024-02.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Meta
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 114 MW
- Reported investment
- $1B
- Reported building area
- 2,000,000 sq ft
- Site area
- 340 acres
- Reported jobs
- 100
Reported dates
- Announced
- 2024-02
- Construction start reported
- 2026
- Expected completion
- 2030
Site
- City
- Tulsa
- County
- Tulsa
- State
- Oklahoma
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- Public Service Company of Oklahoma (PSO)
- Power source
- Mixed sources
- Cooling
- Closed loop
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Tax Incentive District (TID) — 85% annual property tax exemption; 15% collected projected at ~$36 million to taxing entities (city of Tulsa, Wagoner County, Catoosa Public Schools, others) over 25-year incentive period (Tulsa, OK)
Sources, method and limits
Show 9 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Meta Project Anthem — Tulsa | Under construction | Not reported |
| Server Country | Project Anthem (Tulsa East) | Under construction | 114 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 6, 2026 · Record: meta-anthem-tulsa-ok
- CAMeta (about.fb.com) (cited by Compute Atlas)As of: Jul 7, 2026
- CAMeta (atmeta.com) (cited by Compute Atlas)As of: Jul 7, 2026
- CAOklahoma Department of Commerce (cited by Compute Atlas)As of: Aug 6, 2026
- CATulsa Flyer (cited by Compute Atlas)As of: Jul 7, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CANewsOn6 (cited by Compute Atlas)As of: Jul 7, 2026
- CAFOX23 News (cited by Compute Atlas)As of: Aug 6, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0402
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 70620135276007
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Meta Project Anthem — Tulsa”, https://kapwork.com/grow/directory/datacenters/meta-project-anthem-tulsa-ok-dc_403a8813bde7, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.