Skip to content
Data center buildUnder construction

Meta Sarpy Campus (Springfield expansion)

MetaSpringfield, Sarpy County, NEUpdated

Meta is building a data center in Sarpy County, Nebraska (under construction). One source reports this facility in the Kapwork Grow tracker.

Investment
$1.5B
Site
500 acres
Reported jobs
300

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. ~4 yr ago

    Announced

  3. ~4 yr ago

    Construction start

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
MetaOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne
Facility type
HyperscaleFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375

Scale

Reported investment
$1.5BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375
Site area
500 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375
Reported jobs
300Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375

Reported dates

Announced
2022-07Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne
Construction start reported
2022-07Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne

Site

City
SpringfieldCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne
County
SarpyCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne
State
NebraskaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375

Power and cooling

Utility
Omaha Public Power District (OPPD)Utility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375
Power source
Mixed sourcesPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375
Cooling
EvaporativeCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 241759861317375
AI workload
Mixed use, AI among other workloadsAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: meta-sarpy-springfield-ne

Sources, method and limits

Show 7 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasMeta Sarpy Campus (Springfield expansion)Under constructionNot reported

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: meta-sarpy-springfield-ne
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Meta Sarpy Campus (Springfield expansion)”, https://kapwork.com/grow/directory/datacenters/meta-sarpy-campus-springfield-expansion-ne-dc_dbe11aa79eff, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds