Microsoft Pecos Data Center Campus
Microsoft has proposed a 2000 MW data center in Reeves County, Texas (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 2000 MW
- Site
- 7,000 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Microsoft builds
Operator
Microsoft
Utility
Chevron/Energy Forge One LLC
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 3 mo ago
Announced
Reported updates without an event date
Reported for 2026-06.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Microsoft
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 2000 MW
- Site area
- 7,000 acres
Reported dates
- Announced
- 2026-06
Site
- City
- Pecos
- County
- Reeves
- State
- Texas
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Chevron/Energy Forge One LLC
- Power source
- On-site natural gas generation
- Cooling
- Closed loop
- AI workload
- Confirmed AI or machine-learning workload
Sources, method and limits
Show 3 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Microsoft Pecos Data Center Campus | Proposed | 2000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 10, 2026 · Record: microsoft-pecos-tx
- CAMicrosoft (cited by Compute Atlas)As of: Sep 10, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 281079717177418
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Microsoft Pecos Data Center Campus”, https://kapwork.com/grow/directory/datacenters/microsoft-pecos-data-center-campus-tx-dc_ffa3f8b2284a, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.