PORTS-Pike Technology Campus
SB Energy is building a 10000 MW data center in Pike County, Ohio (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 10000 MW
- Reported jobs
- 2,000
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
SB Energy
Utility
AEP Ohio
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 6 mo ago
Construction start
- 6 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- SB Energy
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 10000 MW
- Reported jobs
- 2,000
Reported dates
- Construction start reported
- 2026-03-20Reported date — see the source for the event evidenced.
Site
- City
- Piketon
- County
- Pike
- State
- Ohio
- Location precision
- Street address reported
Power and cooling
- Utility
- AEP Ohio
- Power source
- Mixed sources
Sources, method and limits
Show 13 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | PORTS-Pike Technology Campus | Under construction | 10000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 1, 2026 · Record: new-day-ports-technology-campus-piketon-oh
- CAConstruction Review Online (cited by Compute Atlas)As of: Jul 17, 2026
- CAScioto Valley Guardian (cited by Compute Atlas)As of: Jul 17, 2026
- CASEC EDGAR (cited by Compute Atlas)As of: Sep 1, 2026
- CAU.S. Department of Energy (NEPA) (cited by Compute Atlas)As of: Sep 1, 2026
- CAU.S. Department of Energy (NEPA) (cited by Compute Atlas)As of: Sep 1, 2026
- CAU.S. Department of Energy (cited by Compute Atlas)As of: Sep 1, 2026
- CAU.S. DOE Office of Environmental Management (cited by Compute Atlas)As of: Sep 1, 2026
- CAFederal Permitting Improvement Steering Council (cited by Compute Atlas)As of: Sep 1, 2026
- CANVIDIA (cited by Compute Atlas)As of: Sep 1, 2026
- CAPORTS-Pike Technology Campus (project site) (cited by Compute Atlas)As of: Sep 1, 2026
- CAStatehouse News Bureau (cited by Compute Atlas)As of: Sep 1, 2026
- CAWOUB Public Media (cited by Compute Atlas)As of: Sep 1, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 167202840414029
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “PORTS-Pike Technology Campus”, https://kapwork.com/grow/directory/datacenters/ports-pike-technology-campus-oh-dc_9811f1e8874d, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.