Potomac Church Technology Center
Amazon Web Services is building a data center in Stafford County, Virginia (under construction). One source reports this facility in the Kapwork Grow tracker.
- Investment
- $1B
- Site
- 50 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Amazon Web Services builds
Operator
Amazon Web Services
Utility
Dominion Energy Virginia
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 3 mo ago
Construction start
- 3 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Amazon Web Services
- Stage
- Under construction
- Facility type
- Hyperscale
Scale
- Reported investment
- $1B
- Site area
- 50 acres
Reported dates
- Construction start reported
- 2026-06-18Reported date — see the source for the event evidenced.
Site
- City
- Fredericksburg
- County
- Stafford
- State
- Virginia
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Utility
- Dominion Energy Virginia
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Potomac Church Technology Center | Under construction | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 23, 2026 · Record: amazon-potomac-church-fredericksburg-va
- CAStafford County VA (cited by Compute Atlas)As of: Jul 17, 2026
- CAPotomac Local (cited by Compute Atlas)As of: Jul 17, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 119124813925130
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Potomac Church Technology Center”, https://kapwork.com/grow/directory/datacenters/potomac-church-technology-center-va-dc_6c57e837cb0a, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.