Data center buildUnder construction

PowerHouse 95

PowerHouse Data CentersSpotsylvania, Spotsylvania County, VAUpdated

PowerHouse Data Centers is building a 800 MW data center in Spotsylvania County, Virginia (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
800 MW
Site
145 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. ~2 yr ago

    Construction start

  3. 2 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
PowerHouse Data CentersOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 159346932100372

Scale

Reported capacity
800 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
Site area
145 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 159346932100372

Reported dates

Announced
2024Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
Construction start reported
2024-07Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va

Site

City
SpotsylvaniaCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
County
SpotsylvaniaCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
State
VirginiaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 159346932100372

Power and cooling

Utility
Rappahannock Electric Co-opUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 159346932100372
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 159346932100372
AI workload
Likely AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va

Sources, method and limits

Show 10 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasPowerHouse 95Under construction800 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 26, 2026 · Record: powerhouse-95-spotsylvania-va
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. CA
  9. CA
  10. CA
  11. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “PowerHouse 95”, https://kapwork.com/grow/directory/datacenters/powerhouse-95-va-dc_90ecd948ad14, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.