Skip to content
Data center buildProposed2 datasets report

QTS Clinton Data Center Campus

QTSClinton, Clinton County, IAUpdated

QTS has proposed a data center in Clinton County, Iowa (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Investment
$10B
Building area
5 sq ft
Site
1,200 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 4 mo ago

    Announced

  3. 4 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
2, figures differ
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
QTSOperator · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 122454873321414
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: qts-clinton-clinton-county-iaStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0925
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 122454873321414

Scale

Reported investment
$10BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 122454873321414
Reported building area
5 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 122454873321414
Site area
1,200 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 122454873321414

Reported dates

Announced
2026-05-26Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0925Reported date — see the source for the event evidenced.

Site

City
ClintonCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: qts-clinton-clinton-county-iaCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0925
County
ClintonCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: qts-clinton-clinton-county-iaCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0925
State
IowaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: qts-clinton-clinton-county-iaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0925
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 122454873321414
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 122454873321414

Power and cooling

AI workload
Likely AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: qts-clinton-clinton-county-ia

Sources, method and limits

Show 5 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasQTS Clinton Data Center CampusProposedNot reported
Server CountryQTS - Clinton Data Center CampusProposedNot reported

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: qts-clinton-clinton-county-ia
  2. CA
  3. CA
  4. CA
  5. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0925
  6. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “QTS Clinton Data Center Campus”, https://kapwork.com/grow/directory/datacenters/qts-clinton-data-center-campus-ia-dc_6f5f3f39afc6, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds