Vantage Data Centers OH2 (Millersport Campus)
Vantage Data Centers is building a 696 MW data center in Fairfield County, Ohio (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 696 MW
- Investment
- $2B
- Building area
- 3 sq ft
- Expected completion
- 2030
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Vantage Data Centers builds
Operator
Vantage Data Centers
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 4 yr
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 15 mo ago
Announced
- 15 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2030.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Vantage Data Centers
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 696 MW
- Reported investment
- $2B
- Reported building area
- 3 sq ft
Reported dates
- Announced
- 2025-06-01Reported date — see the source for the event evidenced.
- Expected completion
- 2030
Site
- City
- Millersport
- County
- Fairfield
- State
- Ohio
- Location precision
- Street address reported
Power and cooling
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Vantage Data Centers OH2 (Millersport Campus) | Under construction | 696 MW |
| Server Country | Vantage OH2 Millersport Data Center Campus | Proposed | 696 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 5, 2026 · Record: vantage-oh2-millersport-fairfield-oh
- CAVantage Data Centers (cited by Compute Atlas)As of: Aug 5, 2026
- CAPowered By Who (cited by Compute Atlas)As of: Aug 5, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0988
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 208416442830515
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Vantage Data Centers OH2 (Millersport Campus)”, https://kapwork.com/grow/directory/datacenters/vantage-data-centers-oh2-millersport-campus-oh-dc_bd8dbc0a4eb3, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.