Wonder Valley Utah / Stratos AI Data Center Campus
O'Leary Digital has proposed a 9000 MW data center in Box Elder County, Utah (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 9000 MW
- Investment
- $1
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other O'Leary Digital builds
Operator
O'Leary Digital
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 7 mo ago
Announced
- 7 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- O'Leary Digital
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 9000 MW
- Reported investment
- $1
Reported dates
- Announced
- 2026-02-17Reported date — see the source for the event evidenced.
Site
- City
- Golden Spike area
- County
- Box Elder County
- State
- Utah
Power and cooling
- AI workload
- AI or machine-learning workload reported
Permits and public records
- Incentives reported
- Property Tax Abatement; Pilot; Infrastructure Support; Other
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | Wonder Valley Utah / Stratos AI Data Center Campus | Proposed | 9000 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0590
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 59141764258325
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Wonder Valley Utah / Stratos AI Data Center Campus”, https://kapwork.com/grow/directory/datacenters/wonder-valley-utah-stratos-ai-data-center-campus-ut-dc_35ca03d99a15, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.