Centranet · Fiber · Oklahoma
Official project code: CM61-BEAD-OK-33-1517
Centranet, LLC - Lincoln+Sac and Fox (CM61-BEAD-OK-33-1517) is a broadband project record in Oklahoma. Recorded technology: Fiber. Reported award: not reported. Linked award holder: Centranet.
- Technology
- Fiber
- Planned completion
- Nov 30, 2026 (2026-11-30)
Who's on this project
The award holder decides its own bids and subcontracts.
- Company profile
Award holder
Centranet
- State record
State program
Oklahoma BEAD market
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 2 mo
Planned completionPlanned
- Today
Provisional
Last material change Sep 17, 2026.
- 9 mo ago
Planned startPlanned
Record quality
- Sources cited
- 1
- Summary
- From published records
- Source as of
- Last material change
Record details
NTIA NTIA federal reporting
- Official project code
- CM61-BEAD-OK-33-1517
- Project state or territory
- Oklahoma
- Reported award
- Not reportedReporting period: 2026-04-13
- Planned service locations
- Not reportedReporting period: 2026-04-13
- Recorded deployment technologies
- Fiber
- Project award status
- Provisional
- Planned start
- 2025-12-01Planned date — not evidence that work occurred.
- Planned completion
- 2026-11-30Planned date — not evidence that work occurred.
Description supplied by the source
This project builds to 745 rural locations primarily in and around the town of Cushing, Chandler, Agra, Stroud and Ripley within the Tribal Boundaries of Sac and Fox Nation Tribe. Please note that Centranet is currently building a network for Sac and Fox Nation under the Tribal Broadband Connectivity Program and Sac and Fox Nation has confirmed that only Centranet is authorized to build in their tribal lands. They will only provide a resolution of consent to Centranet. This is confirmed in the attached letter from the tribal chief. The project will be a Fiber to the Home Project that will deploy XGSPON technology to these locations. The Oklahoma Broadband Office has identified these locations as unserved/underserved under the BEAD program. Fiber is the most cost-effective solution for the long term that will not require investments in to this infrastructure again for over 30 years and more. Centranet has an existing fiber network which will be extended to serve these locations and will be the most cost-effective way of doing so.
Sources, method and limits
Show 1 sourceHide
Sources and evidence
- NTIANTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-33-1517
Limitations and interpretation
- An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
- Historical record: this entity is absent from the selected source snapshot. Check the dated source for current status.
Cite or correct this record
Kapwork Grow, “Centranet · Fiber · Oklahoma”, https://kapwork.com/grow/directory/bead/projects/centranet-llc-lincoln-sac-and-fox-pr_365c783ecdceb38224e0, materially updated Sep 17, 2026.
Report an error in this record and we will check it against the cited sources.
An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
Related records
Kapwork Grow
Every BEAD award in the directory, in one place.
Search by trade, company or place.