Skip to content
BEAD projectProvisional

Trace Fiber Networks · Fiber · Oklahoma

Official project code: CM61-BEAD-OK-54-3154

Trace Fiber NetworksOklahomaUpdated

Trace Fiber Networks, LLC. - Trace Fiber Networks Chickasaw Country Project 7 (CM61-BEAD-OK-54-3154) is a broadband project record in Oklahoma. Recorded technology: Fiber. Reported award: not reported. Linked award holder: Trace Fiber Networks.

Technology
Fiber
Planned completion
Dec 31, 2026 (2026-12-31)

Who's on this project

The award holder decides its own bids and subcontracts.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in 3 mo

    Planned completionPlanned

  2. Today

    Provisional

    Last material change Sep 17, 2026.

  3. 8 mo ago

    Planned startPlanned

Record quality

Sources cited
1
Summary
From published records
Source as of
Last material change

Record details

NTIA NTIA federal reporting

Official project code
CM61-BEAD-OK-54-3154Official project code · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154
Project state or territory
OklahomaProject state or territory · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154
Reported award
Not reportedReported award · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154Reporting period: 2026-04-13
Planned service locations
Not reportedPlanned service locations · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154Reporting period: 2026-04-13
Recorded deployment technologies
FiberRecorded deployment technologies · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154
Project award status
ProvisionalProject award status · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154
Planned start
2026-01-06Planned start · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154Planned date — not evidence that work occurred.
Planned completion
2026-12-31Planned completion · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154Planned date — not evidence that work occurred.

Description supplied by the source

race Fiber Networks LLC proposes to deploy a future-ready fiber-to-the-premises (FTTP) broadband network under the Oklahoma BEAD “Benefit of the Bargain” program as part of Chickasaw Country Project 7. The project will deliver high-speed, symmetrical broadband service to more than 1,000 unserved and underserved locations across rural Oklahoma using 100% buried fiber construction. This infrastructure will support gigabit-capable service (minimum 1 Gbps symmetrical), meeting or exceeding all BEAD speed, reliability, and latency standards.\\n\\nThe service area includes a mix of residential homes, small businesses, and community anchor institutions (CAIs) currently lacking adequate broadband connectivity. This targeted expansion is designed to close service gaps in difficult-to-reach rural areas by leveraging Trace Fiber Networks’ existing middle-mile backbone and regional Points of Presence.\\n\\nThe proposed network will be constructed over a 12- to 18-month deployment period and will include full environmental compliance, redundant routing, and climate-resilient design. Trace Fiber Networks will offer a low-cost service tier of $59.95/month for 100 Mbps download and 20 Mbps upload, available universally without eligibility screening. The project also incorporates local workforce hiring, apprenticeship opportunities, and long-term operational sustainability through ongoing reinvestment and subscriber growth.

Description supplied by the source · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154

Sources, method and limits

Show 1 sourceHide

Sources and evidence

  1. NTIA
    NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154

Limitations and interpretation

  • An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
  • Historical record: this entity is absent from the selected source snapshot. Check the dated source for current status.

Cite or correct this record

Kapwork Grow, “Trace Fiber Networks · Fiber · Oklahoma”, https://kapwork.com/grow/directory/bead/projects/trace-fiber-networks-llc-trace-fiber-networks-chickasaw-country-project-7-pr_02c0d897f6df16bc07a8, materially updated Sep 17, 2026.

Report an error in this record and we will check it against the cited sources.

An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

Related records

Kapwork Grow

Every BEAD award in the directory, in one place.

Search by trade, company or place.

Browse the directory