Cologix COL5
Cologix is building a 75 MW data center in Delaware County, Ohio (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 75 MW
- Investment
- $1B
- Site
- 25 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cologix builds
Operator
Cologix
Utility
AEP Ohio
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 3 mo ago
Construction start
- 3 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Cologix
- Stage
- Under construction
- Facility type
- Colocation
Scale
- Reported capacity
- 75 MW
- Reported investment
- $1B
- Site area
- 25 acres
Reported dates
- Construction start reported
- 2026-06-01Reported date — see the source for the event evidenced.
Site
- City
- Lewis Center
- County
- Delaware
- State
- Ohio
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- AEP Ohio
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 8 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cologix COL5 | Under construction | 75 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 10, 2026 · Record: cologix-col5-orange-township-delaware-county-oh
- CASignal Cleveland / Signal Ohio (cited by Compute Atlas)As of: Sep 10, 2026
- CADelaware Source (cited by Compute Atlas)As of: Jul 17, 2026
- CAOhio Department of Development (cited by Compute Atlas)As of: Jul 17, 2026
- CA
- CADelaware County GIS / Assessor (cited by Compute Atlas)As of: Jul 18, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- PEPublic Evidence Project: Subsidy from Ohio Department of DevelopmentAs of: Aug 6, 2026 · Record: source-cologix-col5-orange-township-delaware-county-oh
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 231887348518764
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cologix COL5”, https://kapwork.com/grow/directory/datacenters/cologix-col5-oh-dc_d2e67b094f6c, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.