Data center buildProposed

DC BLOX Nashville Campus

DC BLOXNashville, Davidson County, TNUpdated

DC BLOX has proposed a 50 MW data center in Davidson County, Tennessee (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
50 MW
Investment
$4 ($3.8)
Building area
271,200 sq ft

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 3 mo ago

    Announced

  3. 3 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
DC BLOXOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0827
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0827
Facility type
ColocationFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 200252707411051

Scale

Reported capacity
50 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0827
Reported investment
$3.8Reported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 200252707411051
Reported building area
271,200 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 200252707411051

Reported dates

Announced
2026-06-12Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0827Reported date — see the source for the event evidenced.

Site

City
NashvilleCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0827
County
Davidson CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0827
State
TennesseeState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0827
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 200252707411051

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryDC BLOX Nashville CampusProposed50 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0827
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “DC BLOX Nashville Campus”, https://kapwork.com/grow/directory/datacenters/dc-blox-nashville-campus-tn-dc_b620f77d946b, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.