Microsoft Hebron Data Center
Microsoft is building a data center in Licking County, Ohio (under construction). One source reports this facility in the Kapwork Grow tracker.
- Site
- 227 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Microsoft builds
Operator
Microsoft
Utility
AEP Ohio
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 7 mo ago
Construction start
- ~2 yr ago
Announced
Reported updates without an event date
Reported for 2026-02.
Event date: Not reported · First observed: Not reported
Reported for 2025-04.
Event date: Not reported · First observed: Not reported
Reported for 2024-10.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Microsoft
- Stage
- Under construction
- Facility type
- Hyperscale
Scale
- Site area
- 227 acres
Reported dates
- Announced
- 2024-10
- Construction start reported
- 2026-02
Site
- City
- Heath
- County
- Licking
- State
- Ohio
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- AEP Ohio
- Power source
- Grid power
- Cooling
- Evaporative
- AI workload
- Mixed use, AI among other workloads
Permits and public records
- Incentives reported
- Ohio data-center sales/use-tax exemption (R.C. 122.175), 15-yr, awarded by the Ohio Tax Credit Authority Oct 28 2024 for Microsoft's three Licking County campuses (New Albany, Heath, Hebron); combined value estimated ~$72.5M (Policy Matters Ohio), not disaggregated by site. Microsoft declined real-estate tax abatements at Hebron/Heath, benefiting Lakewood Local Schools. (State of Ohio)
Sources, method and limits
Show 11 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Microsoft Heath Data Center | Under construction | Not reported |
| Compute Atlas | Microsoft Hebron Data Center | Under construction | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 7, 2026 · Record: microsoft-heath-oh
- CAMicrosoft Local (cited by Compute Atlas)As of: Jul 6, 2026
- CAABC 6 WSYX Columbus (cited by Compute Atlas)As of: Jul 6, 2026
- CASignal Ohio (cited by Compute Atlas)As of: Jul 7, 2026
- CAMicrosoft Local (cited by Compute Atlas)As of: Jul 7, 2026
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 7, 2026 · Record: microsoft-hebron-oh
- CAMicrosoft Local (cited by Compute Atlas)As of: Jul 6, 2026
- CASpectrum News 1 (cited by Compute Atlas)As of: Jul 6, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- CASignal Ohio (cited by Compute Atlas)As of: Jul 7, 2026
- CAMicrosoft Local (cited by Compute Atlas)As of: Jul 7, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 180046606686315
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Microsoft Hebron Data Center”, https://kapwork.com/grow/directory/datacenters/microsoft-hebron-data-center-oh-dc_a3c05e08d86b, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.