Skip to content
Data center buildProposed2 datasets report

PowerHouse Caldwell County Data Center

PowerHouse Data CentersUhland, Caldwell County, TXUpdated

PowerHouse Data Centers has proposed a 4000 MW data center in Caldwell County, Texas (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
4000 MW
Site
500 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    PowerHouse Data Centers

    Other PowerHouse Data Centers builds
  • Utility

    Bluebonnet Electric Cooperative (via Tract's Caldwell Valley Technology Park interconnection; LCRA also named for the park)

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 4 mo ago

    Announced

  3. 4 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
2, figures differ
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
PowerHouse Data CentersOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-txOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0840
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-txStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0840
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 110920297649367

Scale

Reported capacity
4000 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-tx
Capacity as the sources range
700 to 4000 MWCapacity as the sources range · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-txCapacity as the sources range · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0840
Site area
500 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 110920297649367

Reported dates

Announced
2026-05-06Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0840Reported date — see the source for the event evidenced.

Site

City
UhlandCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-txCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0840
County
CaldwellCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-txCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0840
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-txState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0840
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 110920297649367
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 110920297649367

Power and cooling

Utility
Bluebonnet Electric Cooperative (via Tract's Caldwell Valley Technology Park interconnection; LCRA also named for the park)Utility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 110920297649367
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 110920297649367
AI workload
Likely AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-tx

Sources, method and limits

Show 6 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasPowerHouse Caldwell County Data CenterProposed4000 MW
Server CountryPowerHouse Austin / Caldwell Valley Data CenterProposed700 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 16, 2026 · Record: powerhouse-uhland-caldwell-county-tx
  2. CA
  3. CA
  4. CA
  5. CA
  6. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0840
  7. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “PowerHouse Caldwell County Data Center”, https://kapwork.com/grow/directory/datacenters/powerhouse-caldwell-county-data-center-tx-dc_64e1a4f094d7, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.