PowerHouse Grand Prairie Campus
PowerHouse Data Centers is building a 1800 MW data center in Dallas County, Texas (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1800 MW
- Investment
- $10B
- Building area
- 8.5M sq ft (8,500,000 sq ft)
- Reported jobs
- 900
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other PowerHouse Data Centers builds
Operator
PowerHouse Data Centers
Utility
Oncor
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- this year
Construction start
- Today
Under construction
Last material change Sep 24, 2026.
- 4 mo ago
Expected completionPlanned
- ~2 yr ago
Announced
- ~2 yr ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2026-05.
Event date: Not reported · First observed: Not reported
Reported for 2026.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- PowerHouse Data Centers
- Tenants
- Amazon Data Services, Inc.
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 1800 MW
- Reported investment
- $10B
- Reported building area
- 8,500,000 sq ft
- Reported jobs
- 900
Reported dates
- Announced
- 2025-02-25Reported date — see the source for the event evidenced.
- Construction start reported
- 2026
- Expected completion
- 2026-05
Site
- City
- Grand Prairie
- County
- Dallas
- State
- Texas
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Oncor
- Power source
- Grid power
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Property Tax Abatement; Tif; Grant; Infrastructure Support; $105,056,000
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | PowerHouse Grand Prairie Campus | Under construction | 1800 MW |
| Server Country | PowerHouse & Provident - Grand Prairie Campus | Under construction | 1800 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 8, 2026 · Record: powerhouse-provident-grand-prairie-tx
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CABisnow (cited by Compute Atlas)As of: Jul 8, 2026
- CADallas Innovates (cited by Compute Atlas)As of: Jul 8, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0472
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 168470382666936
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “PowerHouse Grand Prairie Campus”, https://kapwork.com/grow/directory/datacenters/powerhouse-grand-prairie-campus-tx-dc_9939115064b8, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.