Project Red Clay
Cloverleaf Infrastructure has proposed a 1500 MW data center in Lowndes County, Alabama (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 1500 MW
- Investment
- $1.5B
- Site
- 800 acres
- Reported jobs
- 50
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cloverleaf Infrastructure builds
Operator
Cloverleaf Infrastructure
Utility
Alabama Power
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Cloverleaf Infrastructure
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 1500 MW
- Reported investment
- $1.5B
- Site area
- 800 acres
- Reported jobs
- 50
Site
- County
- Lowndes
- State
- Alabama
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- Utility
- Alabama Power
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Project Red Clay | Proposed | 1500 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 15, 2026 · Record: cloverleaf-red-clay-lowndes-al
- CACloverleaf Infrastructure (cited by Compute Atlas)As of: Sep 9, 2026
- CAWSFA 12 News (cited by Compute Atlas)As of: Sep 9, 2026
- CARoute Fifty (cited by Compute Atlas)As of: Sep 9, 2026
- CAYellowhammer News (cited by Compute Atlas)As of: Sep 9, 2026
- CAOpenStreetMap / Overpass API (cited by Compute Atlas)As of: Sep 9, 2026
- CAWBHM 90.3 (cited by Compute Atlas)As of: Sep 15, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 76742618986099
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Project Red Clay”, https://kapwork.com/grow/directory/datacenters/project-red-clay-al-dc_45cc088b3673, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.