TeraWulf Muskie Data Campus
TeraWulf has proposed a 1000 MW data center in Greenup County, Kentucky (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 1000 MW
- Expected completion
- 2030
- Reported jobs
- 300
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other TeraWulf builds
Operator
TeraWulf
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 4 yr
Expected completionPlanned
- next year
Construction start
- Today
Proposed
Last material change Sep 24, 2026.
- 4 mo ago
Announced
- 4 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2030.
Event date: Not reported · First observed: Not reported
Reported for 2027.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- TeraWulf
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 1000 MW
- Reported jobs
- 300
Reported dates
- Announced
- 2026-05-26Reported date — see the source for the event evidenced.
- Construction start reported
- 2027
- Expected completion
- 2030
Site
- City
- Wurtland area
- County
- Greenup County
- State
- Kentucky
Power and cooling
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | TeraWulf Muskie Data Campus | Proposed | 1000 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0610
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 227537779127006
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “TeraWulf Muskie Data Campus”, https://kapwork.com/grow/directory/datacenters/terawulf-muskie-data-campus-ky-dc_cef1c47f72de, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.