Data center buildUnder construction

Aligned NEO-01

AlignedSandusky (Perkins Township), Erie County, OHUpdated

Aligned is building a 96 MW data center in Erie County, Ohio (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
96 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
AlignedOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 2, 2026 · Record: aligned-neo-01-oh
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 2, 2026 · Record: aligned-neo-01-oh
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 22484431856023

Scale

Reported capacity
96 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 2, 2026 · Record: aligned-neo-01-oh

Site

City
Sandusky (Perkins Township)City · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 2, 2026 · Record: aligned-neo-01-oh
County
ErieCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 2, 2026 · Record: aligned-neo-01-oh
State
OhioState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 2, 2026 · Record: aligned-neo-01-oh
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 22484431856023

Power and cooling

Utility
Ohio Edison (FirstEnergy)Utility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 22484431856023
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 22484431856023
Cooling
Closed loopCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 22484431856023
AI workload
Likely AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 2, 2026 · Record: aligned-neo-01-oh

Sources, method and limits

Show 5 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasAligned NEO-01Under construction96 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 2, 2026 · Record: aligned-neo-01-oh
  2. CA
  3. CA
  4. CA
  5. CA
  6. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Aligned NEO-01”, https://kapwork.com/grow/directory/datacenters/aligned-neo-01-oh-dc_14731092e197, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.