Data center buildUnder construction

Cipher Barber Lake Campus

Cipher MiningColorado City, Mitchell County, TXUpdated

Cipher Mining is building a 300 MW data center in Mitchell County, Texas (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
300 MW
Investment
$1.7B ($1.73B)
Site
587 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. this year

    Construction start

  2. Today

    Under construction

    Last material change Sep 24, 2026.

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Cipher MiningOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 4249490210832

Scale

Reported capacity
300 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx
Reported investment
$1.73BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 4249490210832
Site area
587 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 4249490210832

Reported dates

Construction start reported
2026Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx

Site

City
Colorado CityCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx
County
MitchellCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 4249490210832

Power and cooling

Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 4249490210832
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx

Sources, method and limits

Show 3 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasCipher Barber Lake CampusUnder construction300 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: cipher-barber-lake-colorado-city-tx
  2. CA
  3. CA
  4. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Cipher Barber Lake Campus”, https://kapwork.com/grow/directory/datacenters/cipher-barber-lake-campus-tx-dc_03dd695ac010, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.