Cipher Black Pearl Campus
Cipher Mining is building a 300 MW data center in Winkler County, Texas (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 300 MW
- Investment
- $2B
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cipher Mining builds
Operator
Cipher Mining
Utility
Oncor
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- this year
Construction start
- Today
Under construction
Last material change Sep 24, 2026.
- 10 mo ago
Announced
Reported updates without an event date
Reported for 2026.
Event date: Not reported · First observed: Not reported
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Cipher Mining
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 300 MW
- Reported investment
- $2B
Reported dates
- Announced
- 2025-11
- Construction start reported
- 2026
Site
- City
- Wink
- County
- Winkler
- State
- Texas
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Oncor
- Power source
- Grid power
- AI workload
- Confirmed AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cipher Black Pearl Campus | Under construction | 300 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: cipher-black-pearl-wink-tx
- CABaxtel (cited by Compute Atlas)As of: Jul 7, 2026
- CAPR Newswire (cited by Compute Atlas)As of: Jul 8, 2026
- CAYahoo Finance (cited by Compute Atlas)As of: Jul 8, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 84582453950807
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cipher Black Pearl Campus”, https://kapwork.com/grow/directory/datacenters/cipher-black-pearl-campus-tx-dc_4ced631f3957, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.