Cipher Black Pearl LLC Data Center
Cipher Mining has approval for a data center in Texas (approved). One source reports this facility in the Kapwork Grow tracker.
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cipher Mining builds
Operator
Cipher Mining
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Approved
Last material change Sep 24, 2026.
- ~3 yr ago
Announced
- ~3 yr ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
TX Texas Comptroller data center listKW Kapwork Grow tracker record
Status
- Operator
- Cipher Mining
- Stage
- Approved
- Facility type
- Enterprise
Reported dates
- Announced
- 2024-02-15Reported date — see the source for the event evidenced.
Site
- State
- Texas
Permits and public records
- Texas Comptroller registration
- DC470713, certified 2024-02-15
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Texas Comptroller | Cipher Black Pearl LLC Data Center | Registered, certified 2024-02-15 | Not reported |
Sources and evidence
- TXTexas Comptroller qualifying data center registration (Texas public record)As of: Feb 15, 2024 · Record: DC470713
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 63766630174850
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Texas Comptroller of Public Accounts, data center lists (Texas public record). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cipher Black Pearl LLC Data Center”, https://kapwork.com/grow/directory/datacenters/cipher-black-pearl-llc-data-center-tx-2-dc_39fed3571082, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.