Skip to content
Data center buildProposed

Cipher Colchis Campus

Cipher MiningSan Angelo, Tom Green County, TXUpdated

Cipher Mining has proposed a 1000 MW data center in Tom Green County, Texas (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
1000 MW
Site
620 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 10 mo ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record

Status

Operator
Cipher MiningOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-colchis-tom-green-tx
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-colchis-tom-green-tx
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 44260049558370

Scale

Reported capacity
1000 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-colchis-tom-green-tx
Site area
620 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 44260049558370

Reported dates

Announced
2025-11Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-colchis-tom-green-tx

Site

City
San AngeloCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-colchis-tom-green-txCity · Public Evidence ProjectPublic Evidence Project: Filing from SEC EDGARAs of Aug 6, 2026 · Record: source-cipher-colchis-tom-green-tx
County
Tom GreenCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-colchis-tom-green-txCounty · Public Evidence ProjectPublic Evidence Project: Filing from SEC EDGARAs of Aug 6, 2026 · Record: source-cipher-colchis-tom-green-tx
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 25, 2026 · Record: cipher-colchis-tom-green-txState · Public Evidence ProjectPublic Evidence Project: Filing from SEC EDGARAs of Aug 6, 2026 · Record: source-cipher-colchis-tom-green-tx
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 44260049558370

Power and cooling

Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 44260049558370

Permits and public records

Government records on file
1Government records on file · Public Evidence ProjectPublic Evidence Project: Filing from SEC EDGARAs of Aug 6, 2026 · Record: source-cipher-colchis-tom-green-tx

Sources, method and limits

Show 6 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasCipher Colchis CampusProposed1000 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: cipher-colchis-tom-green-tx
  2. CA
  3. CA
  4. CA
  5. CA
  6. PE
    Public Evidence Project: Filing from SEC EDGARAs of: Aug 6, 2026 · Record: source-cipher-colchis-tom-green-tx
  7. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Cipher Colchis Campus”, https://kapwork.com/grow/directory/datacenters/cipher-colchis-campus-tx-dc_284118881b62, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds