Cipher Colchis Campus
Cipher Mining has proposed a 1000 MW data center in Tom Green County, Texas (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1000 MW
- Site
- 620 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cipher Mining builds
Operator
Cipher Mining
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 10 mo ago
Announced
Reported updates without an event date
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Cipher Mining
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 1000 MW
- Site area
- 620 acres
Reported dates
- Announced
- 2025-11
Site
- City
- San Angelo
- County
- Tom Green
- State
- Texas
- Location precision
- Street address reported
Power and cooling
- Power source
- Grid power
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cipher Colchis Campus | Proposed | 1000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: cipher-colchis-tom-green-tx
- CASEC EDGAR (cited by Compute Atlas)As of: Jul 17, 2026
- CACipher Mining Inc. (cited by Compute Atlas)As of: Jul 17, 2026
- CASan Angelo LIVE (cited by Compute Atlas)As of: Jul 17, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- PEPublic Evidence Project: Filing from SEC EDGARAs of: Aug 6, 2026 · Record: source-cipher-colchis-tom-green-tx
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 44260049558370
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cipher Colchis Campus”, https://kapwork.com/grow/directory/datacenters/cipher-colchis-campus-tx-dc_284118881b62, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.