Cipher Milsing HPC Data Center
Cipher Mining has proposed a data center in Walker County, Texas (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Site
- 187 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cipher Mining builds
Operator
Cipher Mining
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 2 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Cipher Mining
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Site area
- 187 acres
Site
- City
- Huntsville
- County
- Walker
- State
- Texas
- Location precision
- Street address reported
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cipher Milsing HPC Data Center | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 17, 2026 · Record: cipher-milsing-huntsville-walker-tx
- CAU.S. SEC (EDGAR) (cited by Compute Atlas)As of: Jul 17, 2026
- CABaxtel (cited by Compute Atlas)As of: Jul 17, 2026
- PEPublic Evidence Project: Filing from U.S. SEC (EDGAR)As of: Aug 6, 2026 · Record: source-cipher-milsing-huntsville-walker-tx
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 23422408033579
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cipher Milsing HPC Data Center”, https://kapwork.com/grow/directory/datacenters/cipher-milsing-hpc-data-center-tx-dc_154d744f852b, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.