Cipher Stingray HPC Data Center
Cipher Mining is building a 100 MW data center in Andrews County, Texas (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 100 MW
- Site
- 250 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Cipher Mining builds
Operator
Cipher Mining
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 2 mo ago
Construction start
- 2 mo ago
Event date: · First observed: Not reported
- ~2 yr ago
Announced
Reported updates without an event date
Reported for 2024-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- Cipher Mining
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 100 MW
- Site area
- 250 acres
Reported dates
- Announced
- 2024-11
- Construction start reported
- 2026-07-17Reported date — see the source for the event evidenced.
Site
- City
- Andrews
- County
- Andrews
- State
- Texas
- Location precision
- Street address reported
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Cipher Stingray HPC Data Center | Under construction | 100 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: cipher-stingray-andrews-county-tx
- CAU.S. SEC (EDGAR) (cited by Compute Atlas)As of: Jul 17, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 17, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- PEPublic Evidence Project: Filing from U.S. SEC (EDGAR)As of: Aug 6, 2026 · Record: source-cipher-stingray-andrews-county-tx
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 199831702258036
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Cipher Stingray HPC Data Center”, https://kapwork.com/grow/directory/datacenters/cipher-stingray-hpc-data-center-tx-dc_b5bef1a0c174, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.