EdgeConneX New Albany Data Center Campus
EdgeConneX is building a 430 MW data center in Licking County, Ohio (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 430 MW
- Investment
- $1
- Building area
- 1 sq ft
- Expected completion
- Sep 2027 (2027-09)
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other EdgeConneX builds
Operator
EdgeConneX
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 12 mo
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 5 mo ago
Announced
- 5 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2027-09.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Approximate: city centroid
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- EdgeConneX
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 430 MW
- Reported investment
- $1
- Reported building area
- 1 sq ft
Reported dates
- Announced
- 2026-04-14Reported date — see the source for the event evidenced.
- Expected completion
- 2027-09
Site
- City
- New Albany
- County
- Licking County
- State
- Ohio
- Location precision
- Approximate: city centroid
Power and cooling
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | EdgeConneX New Albany Data Center Campus | Under construction | 430 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0789
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 37684536917419
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “EdgeConneX New Albany Data Center Campus”, https://kapwork.com/grow/directory/datacenters/edgeconnex-new-albany-data-center-campus-oh-dc_22461d6fbdab, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.