Meta Prometheus
Meta is building a 1000 MW data center in Franklin County, Ohio (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1000 MW
- Investment
- $1.5B
- Building area
- 2.5M sq ft (2,500,000 sq ft)
- Expected completion
- 2026
- IT load
- 1000 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Meta builds
Operator
Meta
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- this year
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 10 mo ago
Announced
- 10 mo ago
Construction start
Reported updates without an event date
Reported for 2026.
Event date: Not reported · First observed: Not reported
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Reported for 2025-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Meta
- Tenants
- Meta Platforms
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 1000 MW
- Reported IT load
- 1000 MW
- Reported investment
- $1.5B
- Reported building area
- 2,500,000 sq ft
- Reported jobs
- 300
Reported dates
- Announced
- 2025-11
- Construction start reported
- 2025-11
- Expected completion
- 2026
Site
- City
- New Albany
- County
- Franklin
- State
- Ohio
- Location precision
- Site footprint confirmed
Power and cooling
- Power source
- Mixed sources
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Ohio Computer Data Center sales-and-use tax exemption (via Meta operating entity Sidecat LLC); reported ~$600M over roughly 40 years (Ohio)
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Meta Prometheus | Under construction | 1000 MW |
| Server Country | Meta Prometheus (New Albany Campus) | Under construction | 1000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 8, 2026 · Record: meta-prometheus-new-albany-oh
- CASpectrum News 1 (cited by Compute Atlas)As of: Jul 6, 2026
- CANBC4 WCMH-TV (cited by Compute Atlas)As of: Jul 6, 2026
- CABaxtel (cited by Compute Atlas)As of: Jul 6, 2026
- CASignal Ohio (cited by Compute Atlas)As of: Jul 6, 2026
- CAScioto Post (cited by Compute Atlas)As of: Aug 8, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0390
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 170653075802265
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Meta Prometheus”, https://kapwork.com/grow/directory/datacenters/meta-prometheus-oh-dc_9b3543f68899, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.